Recommendations for 2004 -- 2005 Renewal and Replacement
|
Recommendation for Deferred Maintenance Projects 2004 - 2005
| Request |
Requestor |
Total Cost |
| Perform Pre-Earthquake Seismic Engineering Evaluation |
Ryan VanOmmeren |
$3,000.00 |
| Refurbish Streets and REplace Humanities Driveway Apron |
Ryan VanOmmeren |
$20,000.00 |
| Re-duct Alumni Hall HVAC, Replace Drapery and Chairs |
Linda Heidtke |
$25,000.00 |
| Replace Admin/Alumni Hall Mismatched Parking Lot Lights |
Ritch Eich |
$17,500.00 |
| Renovate Mt. Clef Mechanical Building |
Ritch Eich |
$35,000.00 |
| Replace Gym/Little Theater Doors |
Charlene Ismay |
$5,000.00 |
| Repain Gym Annex Sidewalk |
Daniel Kuntz |
$10,000.00 |
| Replace Chapel Transformer |
Ryan VanOmmeren |
$15,000.00 |
| Renovate Ahmanson Science Building Lobby and Corridors |
Andrea Huvard |
$50,000.00 |
| Upgrade Library Lighting and Shelving |
Julius Bianchi |
$50,000.00 |
| Replcae Library Air Conditioner Compressor |
John Urango |
$10,000.00 |
| Add Lighting and Install Erosion Protection in Buth Park |
Student Light Comm |
$8,000.00 |
| Renovate Conejo Hall and Install Fire Sprinklers |
Margaret Miller |
$535,000.00 |
| Replace New West Lobby and 1st Floor Corridor Carpet |
Christine Paul |
$3,450.00 |
Project Contingency |
|
$3,000.00 |
Total - Recommended Projects |
|
$789,950.00 |
Deferred Maintenance Funding |
|
$790,000.00 |
Potential Year-End Fund Balance Improvement Projects Or Department Funded/Unfunded
| Request |
Requestor |
| More consistent and visible signage on campus |
Guy Erwin & Christine Paul |
| Handicap accessible ramp on the Memorial Parkway near Humanities |
Valeri Cirino-Paez |
| Addition of study/conference rooms in Pederson/Thompson |
Michael Fuller |
| Renovate foyers of Pederson/Thompson Hall |
Michael Fuller & Christine Paul |
| Re-cover/Replace Couches in Mt.Cleff Hall Lounge |
Michael Fuller |
| Improve University signage |
Christine Paul |
| Make the a la carte station a permanent building |
Christine Paul |
| Move Habitat House |
Sally Sagen |
| Replace missing tables in Humanities |
Ryan VanOmmeren |
Other Major Maintenance Projects - Unfunded
| Request |
Requestor |
| Reduce the grade of the SUB walkway |
Nicole Hackbarth |
| Replace Junipers at the Student Union Building |
Nicole Hackbarth & Sally Sagen |
| Renovate New West Halls |
Christine Paul |
| Improve the lighting and bleachers in the gymnasium |
Christine Paul |
| Replace the Bridge in Kingsmen Park |
Christine Paul |
| Change ext lighting of Janss & Rasmussen to match Afton |
Margaret Miller |
| Add blackout curtains or another light control on West side of SBET |
Millie Murray-Ward |
| Put in handicapped access doors to the halls in SBET |
Millie Murray-Ward |
| Put in a "trigger" switch for handicapped access for the north door to SBET |
Millie Murray-Ward |
| Place paver stones on pathways between Mogen Hall and Luther Street |
Sally Sagen |
| Replacemen/repair water damaged ceiling in Marketing and Comm office |
Carol Keochekian |
| Move light in visitors parking lot |
Ritch Eich |
| Paint rails and some doors at residence halls |
Charlene Ismay |
| Paint 132 Faculty |
Charlene Ismay |
| Improve exterior lighting and hazardous walkway to Nelson Room |
Ernst Tonsing |
| Preplace Peters Hall transformer |
Ryan VanOmmeren |
| Convert gym area to three phase electrical |
Ryan VanOmmeren |
| Replace fixtures and tiles in Alumni Hall |
Leo Rodriquez |
| Replace fixtures and tiles in the Business Office |
Leo Rodriquez |
| Bath fixtures need to be updated and tile redone in Publications |
Leo Rodriquez |
| Replace tile in women's bathroom of library |
Leo Rodriquez |
| Cut the tree roots & repave, replace with grass at Gym driveway |
Cruz Pulido |
| Add new units and duct work to Peters Hall 105 & 106 |
John Urango |
Capital Project Requests that will be preformed through Regular Maintenance
| Request |
Requestor |
| Remodel downstairs bathrooms in Admin Bldg (in progress) |
Irene Moyer & others |
| Remove cobwebs from administration stairwells |
Ritch Eich |
| Improve efficiency by re-location of t-stat in Alumni Hall |
John Urango |
| Install disability access signs for cafeteria |
Valeri Cirino-Paez |
| Purchase device to ensure electric door access is standard |
Valeri Cirino-Paez |
| Replace missing light fixture above chancel in Chapel |
Unknown |
| Landscape around Conejo Hall (After summer remodel) |
N Hackbarth & M Miller |
| Add pansies to planters at south entrace of SBET |
Millie Murray-Ward |
| Add electrical outlet in SBET copy room |
Millie Murray-Ward |
| Add a decicated circut in SBET copy room |
Millie Murray-Ward |
| Replace sidewalk and cut tree roots along Faculty Street |
Cruz Pulido |
| Update Gym bathrooms (new plumbing for men's only) |
Christine Paul |
| Electrical power box in Kingsmen Park (In progress) |
Michael Fuller |
| Improve landscaping in Kingsmen Park |
Unknown |
| Remove metal circles at entrance of Kramer Court |
Sally Sagen |
| Kramer Patio Door Replacement, add deadbolts on front doors (Done) |
Michael Fuller |
| Remove Pine Tree on the corner of Faculty and Luther |
Camille Collet |
| Paint study lounge in Mogen, add wall protectors |
Sally Sagen |
| Add woodchips to paths from Luther to Mogen Hall |
Sally Sagen |
| Install roof access to Mogen Hall |
Sally Sagen |
| Improve the maintenace of the grass at Mogen Hall |
Sally Sagen |
| Clean awnings to windows of Mogen Hall |
Sally Sagen |
| Install Handicap accessible ramp to Music Building |
Valeri Cirino-Paez |
| Re-landscape parking strip at Admin entrance |
Ritch Eich |
| Renovate Pederson and Thompson stairways and walkways |
Nicole Hackbarth |
| Improve landscaping around residence halls |
Michael Fuller |
| Repair/Re-coat and slip guard external stairwells at all Res Halls (In progress) |
Michael Fuller & others |
| Paint 82 Faculty |
Charlene Ismay |
| Cover pipe in dirt next to Student Union Building |
Unknown |
| Replace sand in volleybal court in New West (Done) |
Christine Paul |
| Update and repair New West grounds |
Christine Paul |
|