| Request |
Requestor |
| Install a Shelf in both Bathrooms of Ahmanson Science Center |
Unknown |
| Paint Eastside of Alumni Hall |
Unknown |
| Improve HVAC Control in Alumni Hall 115 |
Bernard Merkle |
| Renovate Women's Bathroom in the Cafeteria |
Anita Hanney |
| Clean the Carpet in the Nelson Room |
Anita Hanney |
| Replace Classroom Whiteboards in D8 |
Janet Scheel |
| Repaint the Facilities Building |
Tony Adragna |
| Re-install Missing Clock in Humanities Lobby |
Dr. Erany Barrow-Pyor |
| Repair K-1 Door |
Dan Geeting |
| Repair the Top Riser in K-1 |
Unknown |
| Remove Dead Tree in Kingsmen Park |
Robby Larson |
| Fix/Replace Main Entrance Doors to Mogen Hall |
William Rosser |
| Install Conduit and Coaxial Cable to 25 Second Clock on Gym Roof |
Gary Hargrave |
| Finish Replacing Nygreen Hall Doors |
Robby Larson |
| Re-carpet Mi sc. Suites in Thompson and Pederson Halls |
Rosser/Naginey/Adragna |
| Replace Toilet Seats in Residential Halls |
Leo Rodriguez |
| Replace Ceiling Tiles in the Study Aboard Center |
Lisa Loberg |
| Install Wiring for the Network in the Study Abroad Center (by ISS) |
Lisa Loberg |
| Replace the Historical Sign in front of the SUB |
Naginey/Price |
| Improve Grass Maintenance near the Tennis Courts |
Mike Gennette |
| Repair the Cracks in the Tennis Courts |
Mike Gennette |
| Complete Toilet Change-out in Thompson/Pederson Halls |
Leo Rodriguez |
| |
|
| Request |
Requestor |
| Install Wall to Prevent Erosion in Buth Park |
Tony Adragna |
| Upgrade Fire Alarms in the Cafeteria |
Tony Adragna |
| Upgrade Restrooms in Cafeteria to make ADA Compliant |
Tony Adragna |
| Improve Handicap Accessibility Throughout Campus |
Valeri Cirino-Paez |
| Upgrade CLU Owned Houses |
William Rosser |
| Install Signage on CLU Owned Houses |
Angela Naginey |
| Patch Exterior and Paint Unsightly Areas of E Building |
Marsha Anderson |
| Renovate E and F Building Courtyard Area |
Hengst/Adranga |
| Remove the Organ in the Forum |
Robby Larson |
| Paint one of the Mogen Handicap Spots for a Loading Zone |
Nathan Fall |
| Install Two Electronic Scoreboards in Soiland Recreation Center |
Robby Larson |
| Install Ceiling Mounted Curtains in Soiland Recreation Center |
Robby Larson |
| Plant Barren Area on Two Sides of the Humanities Building |
Jarvis Streeter |
| Convert Overton Hall to an Art Gallery |
Robby Larson |
| Renovate the Interior of K Building |
Tony Adragna |
| Upgrade Landscape and Hardscape of Kingsmen Park |
Tony Adragna |
| Upgrade the Main Spine Area |
Tony Adragna |
| Provide Picnic Tables or Seating in Kingsmen Park |
Gary McCubbin |
| Create a New Health Services Clinic |
William Rosser |
| Complete the Furnishing and Carpet Projects in the Library |
Bianchi/Bauer |
| Install a Coffee Bar in the Library Lobby |
Julius Bianchi |
| Upgrade Lighting to Phase II in the Library |
Tony Adragna |
| Expand and Install New HVAC in the Library Server Room |
Marselian/Bianchi |
| Install New Pathway with Lighting from Library to GSFC |
Fall/Larson |
| Install Card Reader on Mogen Hall Side Entrance Door |
Rosser/Sagen/Fall |
| Purchase Furniture for Mogen Hall Patio Area |
Nathan Hall |
| Re-finish Silver Support Poles outside Mogen Hall |
Rosser/Sagen |
| Install Card Readers on Side Entrance Mt. Clef |
Sally Sagen |
| Change out Faucets and Drains in Residential Halls |
Leo Rodriguez |
| Refurbish the Plumbing in Mt Clef Hall |
Tony Adragna |
| Resolve Ventilation Issue in Mt. Clef Bathrooms |
William Rosser |
| Complete the Mt Clef Remodeling Project |
Rosser/Adragna |
| Paint the Exterior of the Pederson Ranch House |
Dan Geeting |
| Remodel Office in the Pederson Ranch House |
Tony Adragna |
| Provide Storage and Scene/Set Workshop Areas for Theater Dept. |
Willaim Rosser |
| Relocate the Costume/Makeup Lab |
Robby Larson |
| Remove Parking on one side of Memorial Parkway |
Sally Sagen |
| Build a New Faculty Parking Lot or Pave Buth Parking Lot |
Jarvis Streeter |
| Upgrade the Landscaping in the Admin Parking Lot (Center) |
Tony Adragna |
| Purchase Heaters for the Pavilion |
Robby Larson |
| Refurbish Main Entrances to Pederson and Thompson Halls |
Rosser/Naginey |
| Remodel 2nd Floor Bathrooms in Pederson Administration Building |
Nicole Hackbarth |
| Add Patio Seating to Back Entrance of Pederson Administration Bldg. |
Nicole Hackbarth |
| Replace Pederson Administration Building Roof |
Tony Adragna |
| Convert Peters Hall 102 or 106 to a Computer Lab |
Grannis/Bianchi |
| Add an Emergency Phone near the SBET Building |
Karrolyne Fogel |
| Install a Sidewalk on the Remainder of Campus Drive towards GSFC |
Rosser/Sagen |
| Add Directional Signage to North Campus Parking |
Nicole Hackbarth |
| Expand the Office Area of the Study Abroad Center |
Lisa Loberg |
| Upgrade the Furniture in the Study Abroad Center |
Lisa Loberg |
| Upgrade Misc. Areas in the Study Abroad Center |
Lisa Loberg |
| Expand and Remodel the SUB |
Kristin Price |
| Replace the Carpet and Re-furnish Public Areas of the SUB |
Rosser/Larson |
| Paint the Emergency Exit Door in the back of the SUB |
Robby Larson |
| Build a New Student Union Building |
Sally Sagen |
| Replace Asphalt Walkway or Add Stairs from Memorial to the SUB |
Rosser/Naginey |
| Add Additional Space or Relocated the Mail Center |
Rosser/Larson |
| Add Trees and Landscaping by Thompson Hall on Faculty Drive |
Paul Egertson |
| Turn West Field into an All-Surface Field |
Nathan Fall |
| Purchase New Furniture for the Woodland Hills Campus |
Tony Adragna |